• Sir_Osis_of_Liver@kbin.social
    link
    fedilink
    arrow-up
    9
    ·
    edit-2
    1 year ago

    Right now Sweden has adequate baseload, they are well positioned to go with more renewable.

    UHVDC and HVDC links can be used to transmit power over thousands of kms. I think the longest line currently is in China a 1100kVDC line that stretches over 3300kms.

    Even with conventional AC transmission, power generated in Churchill and James Bay eventually ends up in population centres in Southern Canada and New England.