• RandAlThor@lemmy.caOP
      link
      fedilink
      English
      arrow-up
      14
      ·
      1 day ago

      My guess is it must be at capacity and there’s no space to build a parallel lane next to the tracks. This is conveyor belt so it is constantly moving in both directions with pellets being dropped back and forth. Of course rail industry has been trying to get to the “conveyor belt” idea for sometime but to have one that’s constantly moving both directions isn’t executable.